E-mail:office@willingtec.com | Tel:+86-573-88197066
Home > News > Content
Operation Process Of I-beam Cold Bending Machine

1. check the coincidence and solidity of the upper and lower dies, and check whether the positioning devices meet the requirements of the machining.

2. when the upper slide and the positioning axis are not in the original state, run back to the origin program.

3. strictly abide by the safety operation rules of machine tools, wear protective equipment according to the regulations.

4. before starting, must carefully check the motor, switch, line and grounding is normal and firm, check the equipment control parts. The button is in the right place.

5. after the equipment is started, the air will be transferred for 1 to 2 minutes, and the skateboard will travel 2 to 3 times. If there is abnormal sound or malfunction, the car should stop immediately. The trouble will be eliminated and all the work can be done after the normal operation.


ZHEJIANG WILLING INTERNATIOANAL CO., LTD 

Address: No.307,#1 West Gaoxin Rd, ETDZ,Tongxiang, Zhejiang, China

Tel:        +86-573-88197066 

Fax:       +86-573-88196600 

Phone:  +86-17757308015 

               +86-13456824686

E-mail:  office@willingtec.com

              monica@willingint.com